• Futaba sections 1 and 2: Soil Separation Facility
    (February 13, 2020)
  • Futaba section 2: Soil Storage Facility
    (February 13, 2020)
  • Okuma section 1: Soil Storage Facility
    (February 14, 2020)
  • Okuma section 3: Soil Separation Facility
    (February 12, 2020)
Interim Storage Facility operates for the safe and intensive storage of the contaminated soil for a limited period of time until final disposal. This Center introduces visitors the overview and progress of the projects, particularly transportation of removed soil and construction of relevant facilities, and safety measures.

News

The your visit should be advance reservations system for the time. When a visit is hoped for, you have a telephone (0240-25-8377) or fill in a matter necessary for the following, “Interim Storage Facility information center visit application", and apply in fax (0240-25-8378) or email (johocenter@jesconet.co.jp) to us.